|
|
|
|
|
|
Same location as of the June, 2005 -- the Route 6A tunnel has been repaired and improved. Note the smooth pavement and the fences to guide bicyclists away from the sharp edges of the culvert tube. The embankment has been stabilized with large stones.
|
|
|